KIA Sportazh - Kia Sportage
Controls and operation receptions
Current leaving and service
The engine
Systems of cooling, heating, ventilation and air conditioning
Power supply systems, managements of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases
Systems of an electric equipment of the engine
Five-step manual box of a gear change
Automatic transmission
Transmissionnaja line
Brake system
   The general information and security measures
   Checks and adjustments of a pedal of a foot brake
   Check of the lever of a lay brake
   Check of serviceability of functioning of the vacuum amplifier of brakes
   Check differential перепускного the pressure valve-regulator (model without ABS and EBD)
   Removal and installation of a pedal of a foot brake
   Removal, service and installation of the main brake cylinder
   Removal and installation of assemblage of the vacuum amplifier of brakes
   Estimation of degree of deterioration, replacement колодок disk brake mechanisms of forward wheels
   Dismantling of the brake mechanism of a forward wheel, estimation of a condition of a disk
   Removal and installation of flexible brake hoses of a hydraulic path of brake mechanisms of forward wheels
   Service of drum-type brake mechanisms of back wheels
   Removal and installation of the lever of a lay brake, adjustment приводного a cable
   Prorolling of brakes
   Reading of codes of malfunctions ABS/EBD, clearing of memory of the processor
   Removal and installation of hydraulic and electronic blocks of management ABS/EBD
   Removal, check installation of wheel gauges ABS
   Replacement of rotors of gauges ABS of forward wheels
Suspension bracket and steering
Body
Onboard electric equipment
Control кузовные the sizes
Schemes of electric connections




Kia Sportage>> Brake system>> Removal, check installation of wheel gauges ABS

Removal, check installation of wheel gauges ABS

Gauges of forward wheels

Removal

 PERFORMANCE ORDER

    Disunite a contact socket of electroconducting of the gauge.
    Turn out a fixing bolt and remove the gauge.

Check

 PERFORMANCE ORDER

    Hang out the car over the earth and attentively study a condition of rotors of wheel gauges from the back party of forward naves, - in case of revealing of the damaged teeths the rotor is subject to replacement (the Section Replacement of rotors of gauges ABS of forward wheels see).
    Measure a backlash between a sensitive element of the gauge and teeths of its rotor, - demanded value makes 0.3 1.0 mm.
    Measure resistance of the gauge, - the result of measurement should not fall outside the limits a range 1385 110 Ohm.

Installation

 PERFORMANCE ORDER

    Installation is made upside-down, - preliminary carefully smooth out a landing surface of the gauge. Demanded value of effort of a tightening of a fixing bolt makes 9.5 Nanometers.

The gauge of back wheels

Removal

The back gauge is fixed on картере a reducer of the back bridge and traces turns of a conducted gear wheel of the main transfer, - the gauge rotor is fixed on a box of interwheel differential.

Check

 PERFORMANCE ORDER

    Estimate a condition of a sealing ring (1) gauges, - in case of need make replacement.
    Measure distance () between a landing surface of the gauge (1) and teeths of its rotor (2).
    Measure length of a sensitive element of the gauge (). By subtraction of result of the second measurement from result of the first (And–) define size of a working backlash, - demanded value lies within a range 0.5 1.0 mm. If the result of calculation makes less than 0.55 mm, pick up a corresponding thickness an adjusting washer. At excessive size of a backlash it is necessary to replace the gauge. Measure resistance of the gauge, - the result of measurement should not fall outside the limits a range 1000 50 Ohm.

Installation

 PERFORMANCE ORDER

    Installation is made upside-down, - preliminary carefully smooth out a landing surface of the gauge. Demanded value of effort of a tightening of a fixing bolt makes 9.5 Nanometers.