KIA Sportazh - Kia Sportage
Controls and operation receptions
Current leaving and service
The engine
Systems of cooling, heating, ventilation and air conditioning
Power supply systems, managements of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases
   Security measures and the general rules accepted at service of components of fuel paths of internal combustion engines
   The power supply system of petrol engines
      The general information
      Check and adjustment of quantity of turns of a single course/moment of ignition/concentration WITH
      Sbrasyvanie pressure in fuel system of the petrol engine, filling of a fuel path
      Power supply system checks
      Removal and installation of components of an inlet air path
      Removal and installation of a pedal of gas, adjustment of a cable of a drive throttle заслонки
      Removal and installation of a fuel tank
      Removal and installation of the fuel pump
      Removal and installation of the gauge of a stock of fuel
      Removal and installation kontrolno-zapornogo the valve
      Removal and installation of submitting and returnable lines of a fuel path
      Removal and installation of a jellied mouth of a fuel tank and separator of fuel evaporations
      Removal and installation of the filter of thin clearing of a fuel path
      Removal and installation of a regulator of pressure of fuel
      Removal and installation топливораспределительной highways
      Removal and installation of fuel injectors
   The power supply system of diesel engines
   Control systems of the engine and decrease in toxicity of the fulfilled gases
   System of release of the fulfilled gases
Systems of an electric equipment of the engine
Five-step manual box of a gear change
Automatic transmission
Transmissionnaja line
Brake system
Suspension bracket and steering
Body
Onboard electric equipment
Control кузовные the sizes
Schemes of electric connections




Kia Sportage>> Power supply systems, managements of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases>> The power supply system of petrol engines>> Removal and installation of a pedal of gas, adjustment of a cable of a drive throttle заслонки

Removal and installation of a pedal of gas, adjustment of a cable of a drive throttle заслонки

Pedal

Details of installation of a pedal of gas

1 — the Cable of a drive throttle заслонки
2 — the Basic arm

3 — the Clamp
4 — the Pedal
5 — the Returnable spring


 PERFORMANCE ORDER

    Make dismantle of components in an order corresponding to their numbering on an illustration. Installation is made upside-down.

Cable

 PERFORMANCE ORDER

    Make sure of completeness of closing throttle заслонок. Measure free wheeling size приводного a cable. If the result of measurement falls outside the limits an admissible range (1.0 3.0 mm), make corresponding updating by rotation of an adjusting nut (see an illustration).