KIA Sportazh - Kia Sportage
Controls and operation receptions
Current leaving and service
The engine
Systems of cooling, heating, ventilation and air conditioning
Power supply systems, managements of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases
Systems of an electric equipment of the engine
Five-step manual box of a gear change
Automatic transmission
Transmissionnaja line
   The general information
   Coupling
   Distributing box
      The general data
      Removal and installation of the lever of switching of modes of a distributing box
      Removal and installation of assemblage of a drive of a speedometer
      Replacement of epiploons of target shaft
      Removal and installation of a distributing box
   Kardannye shaft
   Bridges
Brake system
Suspension bracket and steering
Body
Onboard electric equipment
Control кузовные the sizes
Schemes of electric connections




Kia Sportage>> Transmissionnaja line>> Distributing box>> Replacement of epiploons of target shaft

Replacement of epiploons of target shaft

The order of performance of procedure is similar for both target shaft of a distributing box.


 PERFORMANCE ORDER

    Hang out the car over the earth. Turn out four fixing bolts (two in a support and two in the chassis) and remove a lateral support of a suspension bracket of a distributing box. Merge from a distributing box oil (Current leaving and service see the Head). Having marked landing position of components (see an illustration), turn out fixing bolts and separate from a distributing box corresponding карданный a shaft, - take a shaft aside and tie up it to a cross-section beam.

In order to avoid balancing infringement карданного a shaft do not disunite шлицевое a joint of its sections!

    Having marked landing position, remove a connecting flange of a target shaft.

The nut of a forward flange is painted in silvery colour and have link sided cutting. For fastening of a back flange the nut of bronze colouring with a right-hand carving is used.

    Having hooked a suitable screw-driver, take an old epiploon. Under catalogue number of a detail make sure of correctness of selection of a replaceable epiploon and plant it to the place of the removed. Establish into place a connecting flange and tighten a nut of its fastening with demanded effort (111 Nanometers), - track correctness of combination of the landing labels put in the course of dismantle. Приболтите to a flange карданный a shaft, - besides track correctness of combination of the landing labels put in the course of dismantle. Screw and tighten with demanded effort (36 Nanometers) fixing bolts. Having replaced a sealing washer, screw into place and tighten with demanded effort (30 Nanometers) a drain stopper картера a distributing box. Fill in in a box necessary quantity of fresh oil of a demanded grade, in the correct image having modified its level (Current leaving and service see the Head). Replace a sealing washer screw into place and tighten with demanded effort (30 Nanometers) a jellied/control stopper. Screw into place bolts and nuts of a lateral support of a distributing box. Tighten fixture with demanded effort (nuts: 40 Nanometers, bolts: 23 Nanometers), then lower the car on the earth.