KIA Sportazh - Kia Sportage
Controls and operation receptions
Current leaving and service
The engine
Systems of cooling, heating, ventilation and air conditioning
   The general information
   System of cooling of the engine
      Cooling liquid - the general data
      Replacement of a cooling liquid - broad-brush observations
      Tightness check, replacement of hoses of system of cooling
      Thermostat check
      Check of serviceability of functioning муфты couplings of the fan of system of cooling
      Washing of a path of system of cooling
      Removal and thermostat installation
      Removal, check of a condition and installation of a radiator of system of cooling, replacement радиаторных hoses
      Removal and installation of a broad tank
      Removal and installation перепускного a branch pipe охладительного a path of the petrol engine
      Replacement of the bearing of a drive of the fan of system of cooling
      Removal, installation and service of the water pump
   Systems of ventilation, heating and air conditioning
Power supply systems, managements of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases
Systems of an electric equipment of the engine
Five-step manual box of a gear change
Automatic transmission
Transmissionnaja line
Brake system
Suspension bracket and steering
Body
Onboard electric equipment
Control кузовные the sizes
Schemes of electric connections




Kia Sportage>> Systems of cooling, heating, ventilation and air conditioning>> System of cooling of the engine>> Removal and installation перепускного a branch pipe охладительного a path of the petrol engine

Removal and installation перепускного a branch pipe охладительного a path of the petrol engine

Installation details перепускного a heater branch pipe охладительного a path of the petrol engine

1 — Perepusknoj a hose
2 — the Collar
3 — the Clamp
4 — the Returnable branch pipe of a heater
5 — the Sealing ring

6 — the Sealing lining of a water intake
7 — Perepusknoj a hose
8 — Perepusknoj a branch pipe
9 — the Collar

Removal

 PERFORMANCE ORDER

    Check up three штуцерных a socket перепускной lines охладительного a path on presence of signs of development of leaks. In case of need tighten sockets, or replace a branch pipe. Remove protection картера. Uncover a radiator, then open the drain gate and lower cooling liquid in the prepared capacity of suitable volume. Tighten the gate. Remove an air inlet of an inlet air path (Power supply systems, managements of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases see). Turn out the top bolts of a basic arm of the inlet pipeline. Turn out one bolt from an arm on the pipeline. Remove a wire clamp from an arm behind on the engine, then turn out one bolt and release one clamp. Disconnect electroconducting from the gauge of position throttle заслонки (TPS). Disunite sockets №№ 1 and 2 electroconductings of a fuel highway. Turn out one bolt and release one wire clamp at the left in a back part of the power unit. Disunite sockets of electroconducting of two information gauges, liberate a plait from a basic arm. Remove a thermofilter of a final collector. Remove the bottom thermofilter. Поддомкратьте the car also establish it on props. Turn out bolts of fastening of a reception pipe of system of release of the fulfilled gases. Turn out a bolt of fastening of a basic arm of a reception pipe. Remove a starter (see the Head of System of an electric equipment of the engine) and take him aside, having provided adequate access to перепускному to a branch pipe. Release a fixing collar of a returnable hose of a heater. Turn out a bolt of fastening of a back basic arm of a heating branch pipe on картере transmissions. Disconnect a returnable hose from a branch pipe. Lower the car on the earth. Remove a final collector (Power supply systems, managements of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases see). Turn out a bolt of the left forward arm of a branch pipe of a heater. Disconnect a branch pipe of a heater from a water intake and remove a heating line in gathering.

Installation

 PERFORMANCE ORDER

    Establish on a branch pipe a new sealing ring. Get a branch pipe on the regular place for the engine. Establish a heating hose. Connect a branch pipe to a water intake casing. Screw a bolt of the left forward clamp of a branch pipe. Establish a lining of a final collector. Screw six bolts of fastening of a final collector and tighten them with demanded effort (24 Nanometers). Поддомкратьте the car also establish it on props. Connect a reception pipe of system of release of the fulfilled gases to a final collector. Screw and tighten with demanded effort (24 Nanometers) one bolt of a basic arm of a final path. Screw and tighten with demanded effort (24 Nanometers) three nuts of a basic arm of a landing flange of a reception pipe. Tighten a collar of fastening of a returnable hose of a heater. Screw and tighten with demanded effort (47 Nanometers) three bolts of fastening of a starter. Fix two bolts a basic arm of the inlet pipeline. Screw and tighten with demanded effort (22 Nanometers) a bolt of fastening of a basic arm of a branch pipe of a heater on картере transmissions. Lower the car on the earth. Screw and tighten with demanded effort (22 Nanometers) two bolts of fastening of the inlet pipeline. Connect sockets №№ 1 and 2 electroconductings of a fuel highway. Connect electroconducting to TPS. Screw and tighten with demanded effort (22 Nanometers) in the block of the engine and in the case of the pipeline two bolts with collars of clamps. Screw a bolt of fastening of the left back wire clamp. Tighten it with demanded effort (22 Nanometers). Fill electroconducting in clamps. Establish the bottom thermofilter and fix its two nuts, having tightened them with demanded effort (22 Nanometers). Establish the top thermofilter, - screw and tighten with demanded effort (22 Nanometers) three fixing bolts. Connect electroconducting to a ljambda-probe, fix a plait of wires in the holder. Establish into place an air inlet, connect electroconducting to gauge MAF. Fill cooling system. Поддомкратьте the car, establish it on props and tighten with demanded effort (47 Nanometers) two bottom bolts of a basic arm of a starter. Lower the car on the earth, start the engine and make sure of absence of signs of development of leaks of a cooling liquid.