KIA Sportazh - Kia Sportage
Controls and operation receptions
Current leaving and service
The engine
Systems of cooling, heating, ventilation and air conditioning
Power supply systems, managements of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases
   Security measures and the general rules accepted at service of components of fuel paths of internal combustion engines
   The power supply system of petrol engines
   The power supply system of diesel engines
      The general information
      Power supply system checks
      Adjustment of turns of idling
      Adjustment of installation of phases timing (the injection moments)
      Removal and installation турбокомпрессора
      Removal and installation of a pedal of gas, adjustment of a cable of gas
      Removal and installation of a fuel tank
      Removal and installation of the gauge of a stock of fuel
      Removal and installation of a jellied mouth of a fuel tank
      Removal and installation of the fuel filter
      Removal and installation ТНВД
      Removal and installation of atomizers
   Control systems of the engine and decrease in toxicity of the fulfilled gases
   System of release of the fulfilled gases
Systems of an electric equipment of the engine
Five-step manual box of a gear change
Automatic transmission
Transmissionnaja line
Brake system
Suspension bracket and steering
Body
Onboard electric equipment
Control кузовные the sizes
Schemes of electric connections




Kia Sportage>> Power supply systems, managements of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases>> The power supply system of diesel engines>> Removal and installation турбокомпрессора

Removal and installation турбокомпрессора

Design турбокомпрессора

1 — Turbine assemblage
2 — the Lock plate
3, 23 — Bolts М6
4 — a turbine Wheel
5, 12 — Piston rings
6 — the Thermoprotective casing
7, 9 — the Plug
8 — the Central casing
10 — the Lock ring
11 — the Persistent plug
12 — the Piston ring
13 — the Persistent plate

14 — the Oil separator
15 — the Bolt
16 — the Sealing ring
17 — the Face plate
18 — a compressor Rotor
19 — the Counternut
20 — the Lock ring
21 — a compressor Casing
22 — an U-shaped lock ring
24 — Assemblage of the executive mechanism
25 — the Hose
26 — the Fixing collar


Турбокомпрессор functions in the conditions of heats and speeds of rotation, therefore hit in its working chambers of any extraneous subjects is interfaced to risk of failure of working components!


 PERFORMANCE ORDER

    Merge cooling liquid (Current leaving and service see the Head). Disconnect from турбокомпрессора air sleeves, - take measures against hit in a reception branch pipe турбокомпрессора extraneous subjects and small dust.
The connection scheme to турбокомпрессору air lines (1 and 2)
    Remove термоизоляционный a casing (1).
    Remove with турбокомпрессора by-pass a branch pipe of a water path. Disconnect маслоподающую a tube.
    Remove with турбокомпрессора branch pipes of giving (1) and tap (2) fulfilled gases.
    Disconnect reception and final branch pipes турбокомпрессора.
    Release fixing bolts and remove турбокомпрессор, - at once закупорьте compressor and turbine branch pipes in order to avoid hit in working chambers турбокомпрессора extraneous subjects.

In order to avoid oil hit in turbine or compressor chambers try not to overturn removed турбокомпрессор, constantly focusing it also as it has been established on the engine!


    Check up freedom and smoothness of rotation of a rotor, by means of measuring instrument DTI check up a rotor shaft on presence excessive axial and radial люфтов. Compare results of measurements to requirements of Specifications of the Head of the Power supply system, management of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases.
    Examine turbine and compressor wheel (rotor) on presence of traces of oil and нагарообразования, make sure of absence in wheels of cracks, deformations and other mechanical damages. Check up, the turbine wheel and a rotor do not adjoin to walls of working chambers турбокомпрессора. Having removed a fixing finger of an executive rod, check up smoothness of functioning of the valve of dump. Estimate density of landing of the valve on the saddle in a turbine casing. Installation is made upside-down, - before landing турбокомпрессора on the car fill in an oil small amount in a connection branch pipe маслопровода. Prepare a suitable butterdish, start the engine and allow to it 1-2 minutes to work empty on small turns. After oil will be distributed on internal surfaces турбокомпрессора engine turns can be lifted.