KIA Sportazh - Kia Sportage
Controls and operation receptions
Current leaving and service
The engine
Systems of cooling, heating, ventilation and air conditioning
Power supply systems, managements of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases
   Security measures and the general rules accepted at service of components of fuel paths of internal combustion engines
   The power supply system of petrol engines
   The power supply system of diesel engines
      The general information
      Power supply system checks
      Adjustment of turns of idling
      Adjustment of installation of phases timing (the injection moments)
      Removal and installation турбокомпрессора
      Removal and installation of a pedal of gas, adjustment of a cable of gas
      Removal and installation of a fuel tank
      Removal and installation of the gauge of a stock of fuel
      Removal and installation of a jellied mouth of a fuel tank
      Removal and installation of the fuel filter
      Removal and installation ТНВД
      Removal and installation of atomizers
   Control systems of the engine and decrease in toxicity of the fulfilled gases
   System of release of the fulfilled gases
Systems of an electric equipment of the engine
Five-step manual box of a gear change
Automatic transmission
Transmissionnaja line
Brake system
Suspension bracket and steering
Body
Onboard electric equipment
Control кузовные the sizes
Schemes of electric connections




Kia Sportage>> Power supply systems, managements of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases>> The power supply system of diesel engines>> Removal and installation ТНВД

Removal and installation ТНВД

Design ТНВД

 PERFORMANCE ORDER

    Disconnect a negative wire from the battery. Disconnect a gas cable. Uncover a service aperture of a cogwheel of drive ТНВД.
    Turning the engine in a normal direction, achieve combination of an adjusting label (1) cogwheels with the index in the form of an arrow on a cover of drive ГРМ.
    By means of two bolts (1) length of 35-40 mm block cogwheel ТНВД from проворачивания and release a nut of its fastening, - do not forget to remove the spring washer enclosed under a nut.
    Mark landing position of fixing flange ТНВД concerning a basic arm.
    Disconnect from assemblage ТНВД fuel lines. Turn out fixing nuts, then ослабьте not less than on three turns bolts of fastening ТНВД.
1 — to Turn on
2 — to Weaken
    By means of a special stripper ослабьте landing of a cogwheel of drive ТНВД, then definitively turn out fixing bolts and remove pump assemblage.

Do not turn out bolts blocking a cogwheel from проворачивания until ТНВД it will not be removed from the car!

    Turn out blocking bolts and remove a cogwheel from the pump, - try not to drop segment шпонку. Installation is made upside-down. Track correctness of combination of the landing labels put in the course of dismantle, carving fixture tighten with demanded effort. In summary remove from the pump air.