KIA Sportazh - Kia Sportage
Controls and operation receptions
Current leaving and service
The engine
Systems of cooling, heating, ventilation and air conditioning
   The general information
   System of cooling of the engine
   Systems of ventilation, heating and air conditioning
      The general information and security measures
      Diagnostics of malfunctions, check of components of system K/V
      Removal and installation of assemblage of the forcing fan/evaporator, service of components
      Removal and installation of assemblage of a heater, service of components
      Removal and installation of lines of communication of a refrigerator path of system K/V
      Removal, check and compressor K/V installation
      Removal, check and installation of the fan of condenser K/V
      Removal, check and condenser K/V installation
      Removal, check and receiver-dehumidifier installation
Power supply systems, managements of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases
Systems of an electric equipment of the engine
Five-step manual box of a gear change
Automatic transmission
Transmissionnaja line
Brake system
Suspension bracket and steering
Body
Onboard electric equipment
Control кузовные the sizes
Schemes of electric connections




Kia Sportage>> Systems of cooling, heating, ventilation and air conditioning>> Systems of ventilation, heating and air conditioning>> Removal, check and receiver-dehumidifier installation

Removal, check and receiver-dehumidifier installation

Removal

 PERFORMANCE ORDER

    Disconnect a negative wire from the battery. Forces of the prepared expert make a discharge of a refrigerator path of system K/V.
    Disconnect from a receiver-dehumidifier of a line of a refrigerator path, - at once закупорьте the open ends штуцерных sockets.
    Remove from a basic arm and put aside on a mudguard covered assemblage of a coal adsorber.
    Disunite a contact socket of electroconducting.
    Give three fixing nuts and remove a receiver-dehumidifier.

Check of the two-level gauge-switch of pressure

 PERFORMANCE ORDER

    Switch off ignition. Operating according to instructions of manufacturers, connect special measuring knot and measure pressure in высоконапорном a contour of a refrigerator path. If the result of measurement differs from value 608 кПа, make check of components of a refrigerator path, otherwise pass to a following stage.
    Disconnect electroconducting from the two-level gauge-switch and check up a contact socket of the last on conductivity presence between plugs №№ 1 and 2. If the result of measurement differs from demanded, replace the gauge-switch.

Installation

 PERFORMANCE ORDER

    Installation is made in an order, the return to an order of dismantle of components, - track observance of requirements of Specifications of the Head of System of cooling, heating, ventilation and an air conditioning to efforts of a tightening of carving fixture. In summary forces of the prepared expert make evacuation, vacuum check and a gymnastics of a refrigerator path of system K/V, then start the engine, activate К/В and examine штуцерные sockets of a refrigerator path on presence of signs of development of leaks. In case of need make corresponding corrections.