KIA Sportazh - Kia Sportage
Controls and operation receptions
Current leaving and service
The engine
Systems of cooling, heating, ventilation and air conditioning
Power supply systems, managements of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases
Systems of an electric equipment of the engine
Five-step manual box of a gear change
Automatic transmission
Transmissionnaja line
   The general information
   Coupling
   Distributing box
   Kardannye shaft
   Bridges
      The general data
      Not demanding dismantle of components of procedure of check and service of elements of a drive of wheels
      Replacement of epiploons of differentials
      Removal, service and installation of components of assemblages of forward and back bridges
Brake system
Suspension bracket and steering
Body
Onboard electric equipment
Control кузовные the sizes
Schemes of electric connections




Kia Sportage>> Transmissionnaja line>> Bridges>> Not demanding dismantle of components of procedure of check and service of elements of a drive of wheels

Not demanding dismantle of components of procedure of check and service of elements of a drive of wheels

The forward bridge

Reducer

Check and updating of level of greasing

Current leaving and service see the Head.

Replacement of an epiploon of a shaft of a leading gear wheel of the main transfer

 PERFORMANCE ORDER

    Hang out the car over the earth. Merge from картера differential oil (Current leaving and service see the Head). Disconnect from assemblage of the forward bridge карданный a shaft (Chast Kardannye shaft see).
    Before to release a nut of fastening of a connecting flange, measure starting effort проворачивания differential and size люфта gearings of leading and conducted gear wheels of the main transfer, - results of measurements write down.
    By means of the special adaptation keeping a flange from проворачивания, release a fixing nut.
    By means of a stripper dismantle a flange, then, having hooked a screw-driver, take an old epiploon.
    Grease a new epiploon used for refuelling of differential by oil and by means of approaching оправки запрессуйте it in a reception nest картера differential.
    Establish into place a flange and tighten a nut of its fastening with the effort providing demanded starting effort проворачивания of differential. Connect карданный a shaft (Chast Kardannye shaft see), then make refuelling of differential by oil (Current leaving and service see the Head).

Power shafts

 PERFORMANCE ORDER

    Visually estimate a condition пыльников hinges of both power shafts. Compressing пыльники, make sure of absence of cracks, cuts and signs of ageing of a material. Estimate reliability of fixing пыльников fixing collars (bandage tapes). Examine shaft on presence of signs of obvious deformations.
    Having pulled each shaft in vertical and horizontal directions, make sure of absence of signs of easing of their landing.

Vacuum drive муфт a free wheeling (at a corresponding complete set)

The scheme of the organisation of a vacuum drive муфт a free wheeling

1 — a vacuum Source (the inlet pipeline)
2 — the Control valve
3 — the Vacuum tank (in the left back corner of an impellent compartment)
4 — Sapun
5 — Three-running э/м the valve
6 — the Signal of inclusion of a mode 4WD from the relay of activation of the alarm indicator in a combination of devices

 PERFORMANCE ORDER

    Make sure of serviceability of operation of the alarm indicator of inclusion of an all-wheel drive mode (Controls and operation receptions see the Head). Estimate the general condition of tubes and hoses of a vacuum path, make sure of reliability of their fixing on unions of sockets.
1 — the Vacuum tank
2 — the Vacuum tube
3 — Three-running э/м the valve
    Disconnect a vacuum hose from the union on a rotary fist and by means of the manual vacuum pump create on the union depression by depth of an order of 550 mm hg If depression is kept by assemblage within less than 1 minute, replace муфту a free wheeling, preliminary having made sure that the landing layer of hermetic on its interfaced surface is not destroyed.
1 — the Vacuum tube
2 — the Rotary fist
3 — the Brake disk

Wheel bearings

 PERFORMANCE ORDER

    Lift and tie up a support of the brake mechanism (the Brake system see the Head), remove муфту a free wheeling (see Has undressed Removal, service and installation of components of assemblages of forward and back bridges) and by means of a measuring instrument плунжерного type (DTI) measure size of lateral palpation of a brake disk on a circle removed from the centre of a nave on 12 mm.
    In case of need adjust a pretightness, or dismantle a nave and replace bearings (see Has undressed Removal, service and installation of components of assemblages of forward and back bridges).

The back bridge

Check and updating of level of greasing

Current leaving and service see the Head.

Replacement of an epiploon of a shaft of a leading gear wheel of the main transfer

 PERFORMANCE ORDER

    The order of performance of procedure is similar described above for the forward bridge.