KIA Sportazh - Kia Sportage
Controls and operation receptions
Current leaving and service
The engine
Systems of cooling, heating, ventilation and air conditioning
Power supply systems, managements of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases
Systems of an electric equipment of the engine
   System of ignition of the petrol engine
   System of simplification of cold start of the diesel engine
   Charge and start systems
      The general information
      The storage battery - the general information, recommendations about service
      Charge system - the general data and security measures
      Checks of system of a charge
      Removal and generator installation
      System of start of the engine - the general data and security measures
      Removal and starter installation
      Check and replacement of the gauge-switch of disconnection of a chain of a starter (CPP) on models with Manual transmission
Five-step manual box of a gear change
Automatic transmission
Transmissionnaja line
Brake system
Suspension bracket and steering
Body
Onboard electric equipment
Control кузовные the sizes
Schemes of electric connections




Kia Sportage>> Systems of an electric equipment of the engine>> Charge and start systems>> Removal and generator installation

Removal and generator installation

Removal

All models

 PERFORMANCE ORDER

    Disconnect a negative wire from the battery. If it is required, dismantle procedures stirring to performance components of an inlet air path (Power supply systems, managements of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases see). Disconnect from the generator all electroconducting brought to it.

Petrol models

 PERFORMANCE ORDER

    Release an axial bolt and a fastening bolt натяжителя.
1 — the Axial bolt
2 — the Fixing bolt натяжителя
3 — the Adjusting bolt натяжителя
4 — Privodnoj a belt
5 — Natjazhitel приводного a belt
6 — an arm Bolt
7 — the Adjusting arm
    Rotation of an adjusting bolt ослабьте a tension приводного a belt also remove last from a generator pulley. Definitively screw a fixing bolt and remove натяжитель. Turn out an axial bolt. Release a bolt in the basis of an adjusting arm and develop last upwards. Having lifted the generator, take it from an impellent compartment.

Diesel models

 PERFORMANCE ORDER

    Release axial and adjusting bolts, develop assemblage of the generator and remove from a pulley приводной a belt.
    Disconnect oil and vacuum hoses. Turn out both bolts and remove the generator.

Installation

Petrol models

 PERFORMANCE ORDER

    Get the generator on the regular place. Freely screw an axial bolt. Develop in regular position an adjusting arm, having lowered it not the top part of the generator. Plant on an adjusting arm натяжитель a belt, freely having fixed its fixing bolt.
    Throw a generator pulley приводной with a belt and, rotating an adjusting bolt (1), adjust effort of its tension according to requirements of Specifications of the Head of System of an electric equipment of the engine.

Diesel models

 PERFORMANCE ORDER

    Installation is made in an order, the return to an order of dismantle of components, - adjust effort of a tension приводного a belt by displacement of assemblage of the generator (Specifications of the Head of System of an electric equipment of the engine see), then tighten with demanded effort axial and adjusting bolts.

All models

 PERFORMANCE ORDER

    Track correctness of connection of electroconducting to generator plugs.