KIA Sportazh - Kia Sportage
Controls and operation receptions
Current leaving and service
The engine
Systems of cooling, heating, ventilation and air conditioning
Power supply systems, managements of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases
   Security measures and the general rules accepted at service of components of fuel paths of internal combustion engines
   The power supply system of petrol engines
   The power supply system of diesel engines
   Control systems of the engine and decrease in toxicity of the fulfilled gases
   System of release of the fulfilled gases
      The general information
      Check of a condition of components of system of release of the fulfilled gases
      Removal and installation of components of system of release of the fulfilled gases
Systems of an electric equipment of the engine
Five-step manual box of a gear change
Automatic transmission
Transmissionnaja line
Brake system
Suspension bracket and steering
Body
Onboard electric equipment
Control кузовные the sizes
Schemes of electric connections


https://www.erostopersex.com/


Kia Sportage>> Power supply systems, managements of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases>> System of release of the fulfilled gases>> Removal and installation of components of system of release of the fulfilled gases

Removal and installation of components of system of release of the fulfilled gases

The prevention in the beginning see Check of a condition of components of system of release of the fulfilled gases has undressed!

Reception pipe with каталитическим the converter

 PERFORMANCE ORDER

    Release nuts of fastening of reception section to a final collector/turbokompressoru. Give fixing nuts and separate каталитический the converter from connecting section. Remove assemblage of reception section with каталитическим the converter and two sealing linings. Carefully smooth out interfaced surfaces of connecting flanges, prepare replaceable sealing linings. Installation is made in an order, the return to an order of dismantle of components, - track observance of requirements of Specifications of the Head of the Power supply system, management of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases to efforts of a tightening of carving fixture.

The muffler

 PERFORMANCE ORDER

    Release fastening nuts at first back, then forward connecting flanges of assemblage of the muffler with a connecting pipe. Remove from arms four rubber подвеса and take the muffler from under the car.
FRT — the Direction forward on the car
    Remove two sealing linings and carefully smooth out interfaced surfaces of connecting flanges, - linings are subject to replacement without fail. Installation is made upside-down, - rubber подвесы before installation it is necessary to grease with silicone greasing, track observance of requirements of Specifications of the Head of the Power supply system, management of the engine/decrease of toxicity of the fulfilled gases and release of the fulfilled gases to efforts of a tightening of carving fixture.

Exhaust pipe

 PERFORMANCE ORDER

    Remove rubber подвес an exhaust pipe from a basic arm, then release nuts of a connecting flange.
FRT — the Direction forward on the car
    Take a pipe from under the car. Remove a sealing lining. Installation is made upside-down, do not forget to replace rubber подвес and to grease it before installation by silicone greasing, fixing nuts tighten with demanded effort.